Skip to main content
Industries / Construction & Real Estate / Interior Companies

Site Execution and Snag Lists, Tracked to Handover

An interior fit-out project succeeds or fails on site, against design drawings that keep changing and a snag list that needs closing before handover. TCB Infotech builds the site execution and vendor billing tracking that keeps every project moving toward handover, connected to your existing ERP.

50+ ERP and software projects. Zero failed projects since 2021.

Site Snag List ยท Illustrative
Wardrobe hardware alignment, Bedroom 2
In Progress
Paint touch-up near skirting, Living Room
Open
Kitchen countertop seam finish
Closed
Electrical point relocation, Study
Open
1
Connected view of snag lists and site checklists per project
Every
Material and vendor bill tracked against the project it belongs to
100%
Scoped to your process before work starts
Zero
Failed projects since 2021
Why It Fits an Interior Company

Built Around How a Fit-Out Project Actually Closes Out

A fit-out project is won or lost in the last mile: snags closed, materials matched to the drawing, and a vendor bill that adds up. TCB Infotech tracks that last mile instead of leaving it to a site notebook.

Site Execution Against the Drawing

Snag lists and checklists tracked against each project, not a notebook

Every snag and site checklist item is logged against the project and drawing it relates to, with a status of open, in progress or closed, so a handover date never gets held up by an item nobody remembers raising.

  • Snags tracked with status, not left in a notebook.
  • Checklist items tied to the drawing they check against.
  • Handover readiness visible before the walkthrough.
Completed interior fit-out matching the design drawings
ERP, Software and AI Working Together

Material, vendor billing and site status connected to your ERP

ERP integration keeps vendor billing and finance in your existing system, custom software covers the snag and material tracking a generic module does not, and AI automation flags open snags before a handover date is at risk.

  • ERP integration for vendor billing and finance.
  • Custom tracking for snags, checklists and material choices.
  • AI automation for handover-risk alerts.
Interior design team reviewing site snag list and billing
How It Works

From Your Current Site Workflow to a Running System

1
Map
We review how snags, materials and billing move through your current projects.
2
Scope
We agree the ERP, software and AI pieces needed for your site and vendor workflow.
3
Build
Snag tracking, material logs and vendor billing links are built and tested against your data.
4
Launch
The system goes live on an active project and is watched closely through the first handover.
5
Support
The same team stays available for support as new projects, vendors or checklists come on.
What We Handle

Everything a Fit-Out Project Needs Tracked in One Place

๐Ÿ“‹

Snag List & Site Checklist Tracking

Every snag and checklist item logged against the project and drawing it relates to, with status.

๐ŸŽจ

Design & Material Selection Tracking

Material and finish choices logged against the drawing and project stage they were approved for.

๐Ÿ’ณ

Vendor & Contractor Billing

Vendor bills checked against materials actually approved and installed, not reconciled after the fact.

๐Ÿ“…

Project Stage & Client Milestone Tracking

Client milestones and billing tied to verified stage completion across every active project.

๐Ÿ“ท

Site Visit & Execution Photo Log

Site visit photos logged against the project and snag they document, kept for reference.

๐Ÿ”‘

Handover & Warranty Documentation

Handover checklists and warranty records kept against the project, ready to hand to the client.

What Changes

What Connected Site Tracking Changes for Your Business

Visible
Snag and checklist status across every project in one view
Traceable
Material choices tied to the drawing they were approved against
Connected
ERP, custom software and AI working off the same project data
Controlled
Vendor billing checked against what was actually installed
Faster
Open snags flagged before a handover date is at risk
Zero
Failed projects since 2021
Why Us

Why Interior Companies Run Their Site Tracking Through TCB Infotech

1
We build around your business, not a template
Your snag categories, material list and billing structure shape the system, instead of a generic checklist app.
2
ERP, software and AI from one team
Integration, custom development and automation are scoped and delivered together instead of by separate vendors.
3
Direct access to the people building it
You work with the engineers building your system directly, on your own site and billing data.
4
Support after go-live
The team that builds the system stays available for support and changes as new projects come on.
5
One contract for combined engagements
A project touching ERP integration, custom software and AI at once is scoped as a single engagement.
6
Proven delivery
50+ ERP and software projects, with zero failed projects since 2021.
FAQ

Interior Companies, Answered

What does TCB Infotech do for interior and fit-out companies?
We build ERP integration, custom software and AI automation for interior design and fit-out companies, so snag lists, site checklists and vendor billing are tracked against every project instead of scattered across site notebooks and spreadsheets.
Does this replace our existing ERP or project management software?
No. The system connects to your existing ERP or project system rather than replacing it. We add the snag list, site checklist and material tracking your current setup does not cover, and feed that data back into it.
How do you track material selection and vendor billing against a project?
Material choices and vendor orders are logged against the project and stage they belong to, so a vendor bill can be checked against what was actually approved and installed, rather than reconciled after the fact.
How long does an interior companies engagement usually take?
Most engagements move from mapping your current site and billing workflow to a working pilot within a few months. Exact timeline and scope are confirmed after reviewing your current project and vendor data.
What support do we get after go-live?
The same team that builds the system stays available for support, fixes and changes as your project count, vendor list or checklist needs grow.
Can ERP, custom software and AI be combined into one engagement?
Yes. Most interior company engagements combine ERP integration for billing and finance, custom software for snag list and checklist tracking a generic module does not cover, and AI for flagging open items before handover, scoped as one project.

Get Your Snag Lists and Billing on One System

Book a free consultation, tell us how your site checklists, materials and vendor billing move today, and we will scope the ERP, software and AI that fits your projects.

Book a Free Consultation โ†’

No commitment. See a scope before you decide.

Industries / Construction & Real Estate / Interior Companies Features

How We Track Site Execution, Materials and Billing for Your Projects

From a snag raised on site to a material approved against a drawing to a vendor invoice. Here is how TCB Infotech keeps every fit-out project connected end to end.

Core Process

Snag Tracking, Material Selection and Billing, in That Order

Snag List & Site Checklist Tracking

Every snag logged with a status, tied to a project and drawing

Snags raised on a site walk are logged with a status of open, in progress or closed, tied to the drawing and location they relate to, so a handover walkthrough is a confirmation, not a discovery process.

  • Snags logged with status, location and drawing reference.
  • Site checklists tied to the same project structure.
  • Handover readiness visible before the final walkthrough.
Interior design material and finish selection for a project
Design & Material Selection Tracking

Material and finish choices logged against the approved drawing

Every material and finish selection is logged against the drawing and project stage it was approved for, so a site team installs against the version the client actually signed off on, not an earlier draft.

  • Material choices linked to the approved drawing.
  • Version history kept for changed selections.
  • Site execution checked against what was approved.
Site visit photo log for an interior fit-out project
Vendor Billing & Handover

Vendor bills and handover documentation tied to the same project

Vendor and contractor bills are checked against materials actually approved and installed, and handover checklists and warranty records are kept against the project, ready to hand to the client on the closing walkthrough.

  • Vendor bills checked against approved materials.
  • Handover checklist tracked to completion.
  • Warranty records kept against the project on file.
Reviewing vendor and contractor billing for a fit-out project
What You Get

Everything Included in an Interior Companies Engagement

๐Ÿ“‹

Snag List & Site Checklist Tracking

Snags and checklist items logged with status, location and drawing reference.

๐ŸŽจ

Design & Material Selection Tracking

Material and finish choices linked to the drawing and stage they were approved for.

๐Ÿ’ณ

Vendor & Contractor Billing

Bills checked against approved materials and installed work, connected to your ERP.

๐Ÿ“…

Project Stage & Client Milestone Tracking

Client milestones and billing tied to verified stage completion across every project.

๐Ÿ“ท

Site Visit & Execution Photo Log

Site photos logged against the project and snag they document, kept for reference.

๐Ÿ”‘

Handover & Warranty Documentation

Handover checklists and warranty records kept against the project, ready to share.